Quick navigation:

•  Damp proof under foundation

•  Foundation

•  Damp proof under walls

• Double walls with thermal & acoustic insulation in between

• Built-in shutter cases

• Roof

• Boxed cables for better maintenance

Final

 

 

 

 

31 July 2007







 



 

 

 

 

11 May 2007

All cables are boxed for easy access and maintenance.

Air-conditioning internal units

Air-conditioning external units

Bathroom tiles, perfectly aligned

 

3 March 2007

 

 

Shutter cases are built-in

 

The roof

 






Back of the building

 

 

 

 

20 January 2007

 

Double walls with thermal & acoustic insulation in between

 

Second layer of damp proof course is placed under the walls




Roof level

 

16 December 2006



 

25 November 2006

Concrete for the first floor

 

Construction assistants on the site :)


Concrete samples are taken and tested by the inspector company to test the quality. The reports of concrete and steel samples are available on request.

 

9 November 2006

 

 

19 October 2006

 

6 October 2006

Foundation steels according to the new building regulations

 

 

 

25 September 2006

Damp proof application started on the first layer of 5 cm concrete



(3mm thick water proof membrane)

Second layer of 5 cm concrete to protect the damp proof

Steel work started for the foundation