Magnolia II Apartment Progress Photos | |
<< Back to project details | |
23 August 2008
9 August 2008
28 July 2008
12 July 2008 10 May 2008
2 mm grout lines (instead of commonly used 3 mm)
7 March 2008
9 February 2008
No electric cable joints. All socket cables are connected directly to the fuse box. Cable joints are commonly used in Turkey. They appear on the walls with a circular shape as in the above photo.
Shutter cases are built in the walls
Double walls with insulation material in between 3 January 2008
12 December 2007
11 November 2007 10 November 2007
9 November 2007 Final checks of foundation steels before concrete 6 November 2007 Second layer of concrete in order to protect the damp proof Damp proof of the foundation
3 November 2007 Stabilizing
31 October 2007 Foundation of the shelter
|
|