•  Foundation

•  Damp proof under foundation

23 August 2008

 

 

 

 

9 August 2008

 

 

 

28 July 2008

 

 

12 July 2008

10 May 2008

 

 

2 mm grout lines (instead of commonly used 3 mm)

 

7 March 2008

 

 

 

 

9 February 2008

 

No electric cable joints. All socket cables are connected directly to the fuse box.

Cable joints are commonly used in Turkey. They appear on the walls with a circular shape as in the above photo.

 

 

Shutter cases are built in the walls

 

Double walls with insulation material in between

3 January 2008

 

 

 

12 December 2007

 

 

 

 

 

11 November 2007


10 November 2007

Foundation concrete C30 (resistance:300 kg/cm2)

 

9 November 2007

Final checks of foundation steels before concrete

6 November 2007

Second layer of concrete in order to protect the damp proof

4 November 2007

Damp proof of the foundation

 

 

3 November 2007

Stabilizing

 

31 October 2007

Foundation of the shelter